Eberle #1 Bastrop, Texas

 
 
Please check back for new photos as Project moves forward. ***Latest Photos Added 12-02-09
 
     
     
  Added 12-02-09  
   
 
A picture of the separator with the oil, gas and water pipelines.
 
 

 

 

 
     
  Added 12-02-09  
   
 
President Brandon Toth inspecting the newly installed tanks and separtor.
 
 

 

 

 
     
  Added 12-02-09  
   
 
President Brandon Toth inspecting the well head with a picture of the tanks in the background.
 
 

 

 

 
     
  Added 12-02-09  
   
 
A picture of the well head and overflow pit / gas release area. The oil, gas and water goes from the well head to the separtor then to each respective collection tank or the release as far as the gas.
 
 

 

 

 
     
  Added 12-02-09  
   
 
A picture of the fenced off overflow pit where the initial oil flowed and the gas continues to be released for flair.
 
 

 

 

 
     
  Added 12-02-09  
   
 
A close up picture of the seporator showing the oil levels. The water separates onto the bottom while the oil rises above the water and the gas above the oil. Once the oil and water fill up they are released into each respective tank.
 
 

 

 

 
 



 
  Added 11-22-09  
 
Front side view of tanks installed waiting to connect to oil production on site at Eberle #1 in Bastrop County, Texas.
 
 

 

 

 
     
  Added 11-22-09  
   
 
The tanks freshly installed waiting to connect to oil production on site at Eberle #1 in Bastrop County, Texas.
 
 

 

 

 
     
  Added 11-22-09  
   
 
The Separator Installed on Site at Eberle #1 in Bastrop County Texas.
 
 

 

 

 
     
  Added 11-02-09  
   
  The rig next to the well 10-29-09  
     
 

 

 

 
  Added 11-02-09  
   
  Various field equipment from the last visit 10-29-09  
     
 

 

 

 
  Added 11-02-09  
   
  Operator, Tom Gouger discussing the operations with us 10-29-09  
     
 

 

 

 
  Added 11-02-09  
   
  CEO, Brandon Toth (right) and a local shareholder in front of rig 10-29-09  
 

 

 

 
     
  Added 11-02-09  
   
  The Well Head and Pressure Gauge 10-29-09  
     
     
     
 
 
     
 

 

Added 10-29-09

 
   
  #1 picture - The well service company arriving on site with work over rig and various equipment  
 

 

Added 10-29-09

 
   
  Crews on site checking progress for the day and looking at output  
 

 

Added 10-29-09

 
   
  Over Size Load - The crew begins operations  
 

 

Added 10-29-09

 
   
  On site equipment at Eberle #1  
 

 

Added 10-29-09

 
   
  Weather cleared up just enough to get the job started  
 

 

Added 10-29-09

 
   
  Various equipment and pumps on site at Eberle #1  
 

 

Added 10-29-09

 
   
  Lots of activity within the 3 miles surrounding Eberle # !  
 

 

Added 10-29-09

 
   
  Production has been very active on surrounding leases to the Eberle #1  
 

 

Added 10-29-09

 
   
  Large oil tanks on various leases in the area.  
 

 

Added 10-29-09

 
   
  Just about all the leases surrounding the Eberle #1 had other pump jacks and tanks, this area is very prolific.